DOWNHOLE TECHNOLOGY EXPERTS

Proven performance.
Real results.

Field-proven solutions delivering measurable results for operators worldwide.

Case Studies

From ESP protection in the Bakken to offshore installations around the world, our technologies consistently extend equipment life and reduce costly downtime.

Midland Basin SRP Fallback Prevention

SandMaze SRP adds an average of 112 days of pump run life per well across a 13-well Midland Basin trial.

Read more →

Delaware Basin ESP Fallback Prevention

SandMaze in the Delaware Basin adds up to 420 additional days of ESP run life across 7 wells.

Read more →

Permian Basin Multi-Phase Flow Conditioning

GasMaze delivers smoother ESP operation and over 20% gas production gain in an unconventional Permian well.

Read more →

Bakken - ESP Protection

Integrated sand management extends ESP run life and reduces workover frequency

Read more →

Permian Basin - SRP Protection

Comprehensive fallback protection saves over $20,000 per well per month

Read more →

Offshore Brazil - Custom Engineering

Custom engineered wireline entry guides delivered to operator in Brazil in 6 weeks

Read more →

High-Temp Performance Testing

Equipment tested for 600°F and 30,000 PSI in geothermal applications

Read more →

Libya - International ESP Performance

SandStorm-E and SandMaze reduce ESP failures in high sand production wells

Read more →

Ecuador - ESP Run Life Extension

SandMaze extends pump life and maintains uninterrupted production

Read more →

Selective Zonal Isolation

Multi-stage solution for water breakthrough control for open-hole completion

Read more →

APCV-II™ Sliding Sleeve - Global Performance

Proven reliability with 5,000+ installations worldwide

Read more →

ROGUE™ Frac Plug - Permian Basin Performance

25% reduction in pump down volumes with 6.6-minute average drill out

Read more →

ROGUE™ Frac Plug - Montney Formation Performance

65-70% faster mill times in 50-stage extended reach completion

Read more →

ShortSTAK™ Frac Plug - Multi-Stage Completion Efficiency

$3,000 per stage savings with 45% faster mill out than conventional plugs

Read more →

PetroQuip’s PASS™ Tool - Gulf of Mexico Reliability

Reliable actuation after 10-month temporary abandonment eliminates wireline trip

Read more →

PASS™ Tool - Single Trip Frac Pack Completion

Eliminated wireline trip in single trip perf/pack operation

Read more →

Bigfoot™ Toe Sleeve - Anadarko Basin Performance

Eliminated coiled tubing run, saving tens of thousands in operational costs

Read more →

Your well's profitability depends on equipment that out-performs.

Operators worldwide trust PetroQuip's Production Solutions to prevent the sand damage and equipment failures that cost thousands per day in lost production. From the harshest offshore environments to the most demanding unconventional plays, our equipment performs when everything's on the line.

Extend the life of your wells →

Ready to solve your toughest completion challenges?

Prevent failures and maximize efficiency with proven completion technology.

Operators around the world trust PetroQuip's completion solutions to perform in the most demanding environments. Our proven technologies prevent costly failures and extend operational life, wherever you’re drilling. See how we can help optimize your operations by connecting with our team:

sales@petroquip.com | 936-931-0100 | Contact us | Follow us on LinkedIn