Adjustable Glass Disk
The PetroQuip Adjustable Glass Disk provides temporary isolation of the tubing or casing string for well construction operations. The proprietary glass disk is removed by applying tubing pressure to a preset shear valve. Once it shears, the glass shatters leaving no restriction in the wellbore.
Benefits:
8,500 psi and 10,000 psi available, holds pressure from above
Proprietary metal to metal body thread
Full Bore after activation
No debris trap required
Reliable and cost-effective
Eliminates wireline intervention
Can be run in extreme environments (H2S and CO2)
Disk after Shattering
There are two different activation methods:
Shatter the disk with applied pressure
Mechanically break the disk
Ready to solve your toughest completion challenges?
Prevent failures and maximize efficiency with proven completion technology.
Operators around the world trust PetroQuip's completion solutions to perform in the most demanding environments. Our proven technologies prevent costly failures and extend operational life, wherever you’re drilling. See how we can help optimize your operations by connecting with our team:
sales@petroquip.com | 936-931-0100 | Contact us | Follow us on LinkedIn

