Dissolvable Toe Sub

The PetroQuip Dissolvable Toe Sub features multiple dissolvable buttons designed to dissolve after a set timeframe, enabling seamless well access. Each button is coated to prevent dissolution until wellbore conditions are reached.

Installed just above the cement track, the Dissolvable Toe Sub enables pump-down operations or, when stacked, serves as the first stage of a multi-stage frac. The robust design supports standard cement jobs while maintaining a 10,000 psi burst and collapse rating. Once buttons dissolved, communication from the tubing to the cement and formation through the open flow ports.

Benefits:

  • Each Dissolvable Toe Sub includes 12 customizable flow ports, which can be equipped with dissolvable buttons or steel plugs to achieve tailored limited-entry configurations.

  • Ability to test the “green” cement against the Toe Subs.

  • Dissolution times are adjustable based on the button coating and material, providing flexibility in well planning.

  • The design accommodates any casing size.

Tech Sheet
Contact us

Ready to solve your toughest completion challenges?

Prevent failures and maximize efficiency with proven completion technology.

Operators around the world trust PetroQuip's completion solutions to perform in the most demanding environments. Our proven technologies prevent costly failures and extend operational life, wherever you’re drilling. See how we can help optimize your operations by connecting with our team:

sales@petroquip.com | 936-931-0100 | Contact us | Follow us on LinkedIn