CASE STUDY:
SRP Protection - Permian Basin
Comprehensive fallback protection saves over $20,000 per well per month with SandMaze SRP
Challenge
A Permian Basin operator running sucker rod pumps faced recurring pump failures caused by sand and debris falling back into barrels during pump-off periods. This damaged plungers and barrels, reducing efficiency and requiring frequent pump replacements at significant cost.
Solution
PetroQuip installed SandMaze SRP across multiple wells. The proprietary check valve design prevented sand from re-entering the barrel and plunger while allowing fluid to pass. The self-cleaning feature automatically flushed captured sand during restart.
Results
Savings of over $20,000 per well per month
Significant reduction in pump replacement frequency
Extended pump life across the field
Eliminated fallback-related failures
Products
Questions? Contact our team to learn more | View all Production Solutions
Ready to extend your SRP life and reduce costly work-overs?
Contact your PetroQuip sales representative to discuss how SandMaze SRP can protect your SRP investment and maximize production efficiency.
Email: sales@petroquip.com
Phone: 936-931-0100

